Ad image

Third Mainland Bridge section closed for repairs

Agency Report
Agency Report
Third Mainland Bridge

The Federal Ministry of Works has announced closure of the Oworo-bound section of the Third Mainland Bridge, from midnight of Saturday (May 25) until 6.00 p.m. on Sunday (May 26).

The Federal Controller of Works in Lagos State, Mrs Olukorede Kesha, made the announcement in a statement on Saturday in Lagos.

READ ALSO: Nigerian children at risk of losing identity -First Lady

The controller said that the closure was to enable the ministry to carry out urgent repairs on the bridge.

Kesha, who regretted all inconveniences that the closure might cause motorists, advised them to use alternative routes.

Source: NAN

Share This Article